Closing of locks and hydraulic structures, 2025

Navigation 2025 is coming to an end, and we are sharing useful information about the closure of locks and navigable hydraulic structures within the established timeframe (i.e., before the extension of commercial lock operations):

 

FBU “Administration of the White Sea Canal”
⏳ Gates Nos. 1-9: October 31 (~ until 10.11, sluicing outside the established deadlines)
⏳ Gates Nos. 10-19: October 15 (~ until 10.11, sluicing outside the established deadlines)

 

FBU “Administration of the Volga-Balt Canal”
✅ Nizhne-Svirsky: November 15
✅ Verkhne-Svirsky: November 15
✅ Gates No. 1-6: November 15
✅ Sheksninsky: November 15
🔴 Volkhovsky: September 30

 

FGBU “Moscow Canal”
✅ Rybinsky: November 17
✅ Uglichsky: November 17
✅ Gates No. 1-9: November 17
✅ Moskvoretskaya system, gate No. 10: November 17
✅ Belooomut: November 17
✅ Kuzminsk: November 17

 

FBU “Administration of the Volga Basin of the VVP”
✅ Gorodetsky No. 13-14, No. 16: November 19
✅ Cheboksary: November 20
✅ Samara: November 20
✅ Balakovo: November 24

 

FBU “Kamvodput”
🔴 Perm: November 1

Read also