Cargo transportation for the construction of the El-Dabaa nuclear power plant in Egypt



ABOUT THE PROJECT: 

  • Period: September – October, 2024
  • Route: Syzran village – Novorossiysk village
  • Fleet: tugboat “Monsoon”, barge “Morvenna-2501”
  • Equipment: 4 sets of ramps on the barge “Morvenna-2501”
  • Cargo: components of the melt localization device “Hull”, filler, maintenance site, block 4-7 products for the El-Dabaa NPP. Weight – 467 286 kg.
{:ru}Международная буксировка танкера TARAZ{:}{:en}Towing TARAZ Tanker{:}
{:ru}Международная буксировка танкера TARAZ{:}{:en}Towing TARAZ Tanker{:}

PROJECT ACHIEVEMENTS & SOLUTIONS:

  • The tugboat “Monsoon” was based on the Volga River, for the acceptance of the barge he had to go to Samara. There he picks up a barge, on which two sets of ramps are installed.Delivery of a barge-towing train to the village of Syzran, where the products are loaded. The RBT-16 raiding and harbor tugboat was involved in the Volga–Don Shipping Canal (VDSK)-Rostov-on-Don section.The Azov Sea – Novorossiysk route was accompanied by the tugboat Ruslan-1Unloading of cargo at the port of Novorossiysk.

     

For reference: The El-Dabaa NPP is the first nuclear power plant in Egypt. The project is being implemented by Rosatom on the northern coast of the country, 3.5 km from the Mediterranean Sea.