OSR Duty for Well Drilling



[/vc_column_text][/vc_column][/vc_row]

OSR Duty for Well Drilling

PROJECT VESSELS: 

ABOUT THE PROJECT:

  • Location – Caspian Sea;
  • The task was to ensure the safe operation of the Dada Gorgud drilling rig;
  • Duration six months of 24/7 duty;
  • The project in partnerwship with LUKOIL and KazMunayGas companies.

OSR Duty for Well Drilling

PROJECT ACHIEVEMENTS: 

  • In case of an emergency oil spill, the vessel was equipped with two skimmers and booms more than 200 m long.
  • The team with five certified professional rescuers was on duty 24/7.
  • The duty continued in winter despite low temperatures.
  • The crew of the vessel worked under waves of up to 6 meters caused by drilling of the well.