Sand-Gravel Mixture Shipping



[/vc_column_text][/vc_column][/vc_row]

Sand-Gravel Mixture Shipping

PROJECT VESSELS

ABOUT THE PROJECT: 

  • Project duration: May 2022 – November 2023;
  • Loading Landovka; m. d. Kamskoye; Menedeleevsk; Kamskoe estuary;
  • Unloading: Kazan, Cheboksary, Nizhny Novgorod, Togliatti;
  • Project objectives: transportation of sand and gravel mixture (SGM).
Sand-Gravel Mixture Shipping

PROJECT ACHIEVEMENTS:

  • Two, sometimes three Charterer’s barges were towing simultaneously.
  • During transportation, the ship was moving 24/7. Over a year and a half of non-stop work, there were not downtime or delays .
  • While unloading one barge, the tug was preparing the second. Thanks to this, loading and unloading did not exceed 6 hours.