Twing Barges Towing



[/vc_column_text][/vc_column][/vc_row]

Twing Barges Towing

PROJECT VESSELS: 

ABOUT THE PROJECT:

  • Route: Baku – Astrakhan – GDP – St. Petersburg – Murmansk;
  • Duration: 46 days;
  • Task: towing 2 pontoons TWIN BARGES: Ruth + Silke.

Twing Barges Towing

PROJECT ACHIEVEMENTS: 

  • From Baku to Astrakhan two pontoons were being towed in a paired state.
  • Further transportation along the GDP involved passage through locks. For this purpose, two pontoons were disconnected in the port of Astrakhan, and additional vessels were connected to tow the barges.